Subsections

3.2 Manipulating Projects  

In this section we describe how you can load, save and alter RaPID projects.

3.2.1 Saving Projects      

Once you defined a project, it can be saved using the File $\rightarrow \;$Save Project menu entry in any of the ``Data Acquisition'' windows. This results in the dialog box of Figure 3.12. Projects are saved in files with extension .pro. The default file name is the project name. The default directory is $RaPID\data. All necessary data is saved with the project:


  
Figure 3.12: Saving a RaPID project in a .pro file. You can easily retrieve the project with the menu entry File $\rightarrow \;$Load Project.
\begin{figure}
\centering
\includegraphics [width=9.2cm]{line1.ps}
\end{figure}


3.2.2 Loading Projects      

You can load previously saved projects into RaPID with the menu entry File $\rightarrow \;$Load Project. Depending on the mode RaPID was started in, the following projects can be loaded:

File:
File, Simulink and Real Time projects. When you load a Simulink or Real Time project in File mode, the information about the Simulink model or the Real Time hardware is discarded. This enables you to work with projects you defined in Simulink or Real Time mode, without needing the full Simulink model or the Real Time device always at hand.
Simulink:
Simulink projects only.
Real Time:
Real Time projects only.

Note that all internal RaPID data are deleted (after confirmation) at the moment a new project is loaded.

3.2.3 Changing Projects     

An existing project can be altered in two different ways:    

1.
By using the menu entry Edit $\rightarrow \;$Project. This pops up the ``Edit Project'' window of Figure 3.13. You can thus change:


  
Figure 3.13: With the ``Edit Project'' window you can change the project name, the input and output names and units and the extreme values of the process input and output.
\begin{figure}
\centering
\includegraphics [width=8.9cm]{line1.ps}
\end{figure}


Note that it is not possible to change the sample time and unit in this window.

2.
A second way to change the project is by using the menu entry File $\rightarrow \;$New project. Even though this will destroy the current project, the new project window will come up with all the current settings. In this way, you can for instance easily change the sample time of an existing project.



Copyright ISMC nv
1/21/1998